7 Common I-Joist Installation Mistakes—and How to Avoid ...
Jul. 29, 2024
7 Common I-Joist Installation Mistakes—and How to Avoid ...
Engineered to provide strength and consistency, Weyerhaeusers Trus Joist® TJI® joists are one of the most fundamental components of a solid, high-performance floor system. And with their light weight and long lengths, TJI joists are faster and easier to install than traditional framing, which can save time and money.
If you want to learn more, please visit our website XINFUSHI.
But even with the familiarity and ease of use, there are a few common mistakes during installation that can lead to red flags and tear-outs, or to squeaky floors for homeowners down the road. Many errors can be avoided simply by better communication across the project team, by planning ahead and by paying careful attention to plans and drawings.
Heres a look at seven common mistakes with I-joist installationand how to prevent them.
1. Lack of Communication
Many of the mistakes listed here come back to one simple problem: ambiguity between the dealer, architect, builder and framing contractor. By considering the plans collaboratively and well in advance, the team can confirm material instructions, determine precise hole locations, spot potential problem areas, verify loads and offer guidance on installation details, thus avoiding confusion and costly errors on site.
2. Improper Use of Blocking Panels and Squash Blocks
Blocking panels are used for lateral restraint of the joist (to keep the ends moving from side to side), to transfer load from above around the joist or for shear wall nailing from above. Squash blocks are used to transfer load from above around the joist. Failing to install either component, doing so incorrectly, installing them when not needed, putting them in the wrong place or mixing up the two can mean a floor system incapable of managing loads and performing as designed.
For guidance on when and where to install blocking panels and squash blocks for TJI joists, download the Installation Guide for Floor and Roof Framing (also available as a video series), consult with your Trus Joist Territory Manager or talk to your dealer.
3. Failure to Account for Load
Similarly, make sure the plans account for and track all loads from the roof to the foundation and that post loads are adequately blocked to the foundations. Consider any additional loads that could come in later, such as countertops or appliances. Consult with the Installation Guide or your Territory Manager for load path assistance and advice.
4. Disregard for Plans
Floors are designed specific to their application, based on the design loads and project specifics, so putting joists at a different spacing or installing the wrong series of I-joist can mean tear-outs and replacements later. Always follow plan instructions when it comes to product selection and placement.
5. Improper Hole Cutting
One of the biggest areas where contractors shouldbut dontcollaborate is placement of holes in the joist web for pipes, ducts and wiring. If holes are cut too close to the flanges or joist bearing locations, if holes are too large, if too many holes are cut or if they are placed too close together, it may impact the performance of the joist.
To avoid these problems during installation, determine hole locations during the design phase. If that best-case scenario is not possible, ensure your installers verify hole placements before cutting. Consult with hole charts from your I-joist manufacturer or with your manufacturer directly for direction, or coordinate with the architect or dealer who can run calculations and determine precise placement.
Similar problems occur when the I-joist flange has to be notched in the field, such as for plumbing drops from above. This is where pre-planning and communication are essential: If problem areas can be identified ahead of time, the joist placement and spacing can be adjusted prior to installation, avoiding improper field notches that can affect the joists structural integrity.
6. Material Exposure
Like all wood materials, I-joists are susceptible to moisture. Avoid unnecessary moisture exposure of all wood components by enclosing the frame against adverse weather as soon as feasible.
7. Walking on Joists
Before all accessories and floor decking are installed, I-joists are unstable and can roll over if walked on, leading to injuries. Dont allow your crew to walk on I-joists or install subfloor sheathing until all hangers, blocking panels and temporary safety bracing (strapping) are fully installed.
While these mistakes are the most frequently seen during floor system installation, theyre also completely avoidable, and, in most cases, communication among the trades and proper education are all thats required to avoid costly tear-outs. Ensure your project team is coordinating on material placement, and consult with your Trus Joist Territory Manager for assistance. Simple steps can ensure the floor system performs as it should over its lifetime.
How big of a hole can you put in an I-joist?
Today Ill cover the basic rules for putting holes into I-joists. I discussed notching and boring for dimensional lumber in last weeks blog post, and it was easy to cover because the rules are the same for everything. When it comes to I-joists, the rule in the codebook is even simpler: follow the manufacturers instructions. You can find the exact language under section R502.8.2 of the International Residential Code. But now it gets a little more complicated.
For more information, please visit i joist beam.
Manufacturers rules for holes in I-Joists
The exact rules for putting holes in I-joists will vary from manufacturer to manufacturer. If you want to know the exact rules for any given joist, you need to know the make, model, and size of the I-joist. Once you have these three pieces of information, fire up your Google machine and look up the manufacturers specs. Just for fun, here are five different sets of rules from five different manufacturers:
Not surprisingly, theyre all pretty similar. Ill discuss the stuff they all have in common.
Dont mess with flanges. The flanges are the top and bottom parts of every I-joist, and you cant touch em. No cuts, notches, holes, or dirty looks. Theyre sensitive, ok?
Big holes in the middle are fine. Compared to the rules for boring holes in dimensional lumber, you can put surprisingly large holes in the middle web of I-joists. In fact, you can put holes that go almost all the way from the bottom to the top of the joist. TJI, for example, say you just need to leave 1/8 of webbing remaining! For people used to looking at dimensional lumber, these holes look very, very wrong but theyre actually fine.
Stay away from supports. While its ok to make big holes in I-joists, you need to stay away from bearing points. These exact rules vary quite a bit from manufacturer to manufacturer, but in general, manufacturers are fussy about holes too close to areas with support beams below.
Only small holes in cantilevers. Manufacturers will allow holes in cantilevered sections, but only up to 1-1/2 in diameter.
Lots of small holes equal one big hole. Holes need to be spaced certain distances from each other, but if you want to put a bunch of holes in one spot, you can count them all as one big hole.
Big holes belong in the middle of the span. If you have to put a big hole in an I-joist, the best place is in the middle of the joist span. The closer you get to the edge of a joist, the smaller the hole youre allowed to place there.
Summary
The rules for putting holes in I-joists come from the manufacturers. To know exactly whats allowed, you need to do some research, but in general, the rules are all pretty similar. The two biggest things to remember are that big holes are allowed in the middle, and dont mess with the flanges.
If you are looking for more details, kindly visit door skin plywood.
43
0
0
Comments
All Comments (0)