The SWA's Renewable Energy Facility 2 (REF 2) is a $672,000,000, state-of-the-art waste-to-energy facility. The REF 2 project is the first of its kind in more than 20 years, and the most advanced, efficient, cleanest and greenest waste-to-energy power plant in the world.

qunfeng supply professional and honest service.

REF 2 Frequently Asked Questions»

Facility Highlights

REF 2 is estimated to reduce the amount of waste going to SWA's landfill by up to 90 percent, ensuring the landfill lasts until . (See the current Landfill Depletion Model report.) While reducing waste, it generates 100 megawatts of electricity for the people in Palm Beach County. That's enough electricity to provide power for an estimated 45,000 homes and businesses, or about all the homes in Boca Raton.

At capacity, REF 2 will process more than one million tons (907,200,000 kg) of post-recycled municipal solid waste annually and 3,000 tons daily -- more than 660 curbside trucks worth of trash every day!

How the Plant Works

Unlike REF 1, where post-recycled municipal solid waste is processed into refuse-derived fuel, REF 2 is a mass burn facility. Post-recycled municipal solid waste is unloaded directly into "the Pit," which is designed to handle up to seven days (21,000 tons/19,100,000 kg) of waste or 4,200 curbside trucks of garbage.

Unlike REF 1, where post-recycled municipal solid waste is processed into refuse-derived fuel, REF 2 is a mass burn facility. Post-recycled municipal solid waste is unloaded directly into "the Pit," which is designed to handle up to seven days (21,000 tons/19,100,000 kg) of waste or 4,200 curbside trucks of garbage.

From REF 2&#;s pit, the waste is fed by grapples that look like giant claws into one of three boilers. These grapples can hold nine tons of garbage, or about twice the garbage held in one full curbside truck. The claw could pick up a Tyrannosaurus Rex!

There, the waste is burned to generate steam. Each of the three Babcock & Wilcox boilers can process 1,000 tons (907,000 kg) of waste per day due to state-of-the-art Volund Wave Grate system which allows for more complete combustion and greater volume reduction of the waste. Each boiler generates 284,400 pounds per hour of superheated steam which drives a turbine generator to produce electricity.
 
REF 2 recovers about 90 percent of ferrous metals and 85 percent of nonferrous metals from the ashes after the incineration process. It's expected to recover an estimated 27,000 tons of steel, aluminum, copper and other metals annually after the trash is burned. 

Environmental Innovations and Pollution Controls

REF 2 benefits from the best available pollution control technology, ensuring very low air emissions. In fact, REF 2 meets emission permit limits that are the lowest of any renewable energy facility currently combusting municipal solid waste in the United States.

Contact us to discuss your requirements of China Srf Waste To Energy. Our experienced sales team can help you identify the options that best suit your needs.

Additional reading:
Biscuit Making Machine : A FAQ Guide
What is PE shrink film?
Top Benefits of Gravity Sorting Chute in 2024

Pollution control measures at REF 2 include:

  • The use of carbon powder to remove mercury and volatile organic compounds (VOCs) from ash after combustion

  • Utilization of lime slurry to control acid gases in the Spray Dryer Absorbers (SDA)

  • Baghouses that filter fly ash, lime and carbon powder and prevent the release of particulates

  • The use of ammonia to turn nitrogen oxide (NOx) into harmless nitrogen and water (H2O) vapor in the Selective Catalytic Reduction System (SCR); 

    REF 2 is the first waste-to-energy facility in the United States to reduce NOx emissions using SCR.

REF 2 features a unique rooftop rainwater collection system that includes a two-million-gallon cistern. This system provides a portion of the water necessary to operate the facility, reducing REF 2's use of treated water.

More information about renewable energy»

The High Cost of Waste Incineration - GAIA

- Plastic - November 27,

Plastic offsets and credits will not tackle plastic pollution or channel finance to where it is most needed in a stable, long term and reliable way. Multiple investigations and reports have found that the burgeoning plastic credits and offsetting system is flawed and does nothing to avoid the generation of plastic pollution, nor does it reduce the use of virgin plastic. As such, plastic credits should not be incorporated into the financial mechanisms of a future plastic treaty.

Read this 2-page policy brief from Break Free From Plastic and GAIA - Global Alliance For Incinerator Alternatives.

Want more information on Organic Waste Treatment Plant? Feel free to contact us.

9

0

Comments

0/2000

All Comments (0)

Guest Posts

If you are interested in sending in a Guest Blogger Submission,welcome to write for us!

Your Name (required)

Your Email (required)

Subject

Your Message (required)

0/2000